Maintenance
Maintenance on the Fixation unit should be done Weekly.
Fixation Unit Maintenance Procedure
- The Fixation Unit should be completely cold
- Open the two latches at the front of the Fixation Unit
- Using 2 people open the fixation unit, THE DOOR IS VERY HEAVY
- Using the chain links on the left and the right hook the door to the top of the Fixation Unit
- Spray WD40 Copper Grease or WD40 Silicon Grease on the drive shafts
- Located on the left and right hand side of the machine
- Spray from the top to the bottom to allow for even coating
- Located on the left and right hand side of the machine
- Lower the door back in place THE DOOR IS VERY HEAVY, THIS IS A TWO PERSON OPERATION
No Comments